Spring Garden Partition
|
McKay Consulting worked with the real estate agent on this two parcel partition plat in Forest Grove, Oregon. To meet minimum lot size requirements a lot line adjustment was completed between a third parcel.
McKay Consulting completed a design survey (Boundary and Topographic), prepared the partition plat and prepared a plot plan used to obtain building permits. |
|